Fire fighting and fire alarm design, with Civil Defence approval
Fire systems are the one part of the MEP package where an approval is not a formality. UAE Civil Defence reviews the hydraulic calculation, the detection coverage and the means of escape, and a submission that has been assembled rather than engineered comes back with comments.
Khabir is an approved fire fighting and fire alarm design consultant. We design the system, calculate it, submit it and answer the comments, through to the Certificate of Compliance.
What the fire scope covers
Automatic sprinkler design
Hazard classification, spacing and coverage per head, and a full hydraulic calculation demonstrating the design density at the most remote area.
Fire pump rooms
Pump selection and arrangement to NFPA 20, jockey pump, controller, test header, and the room layout and ventilation needed to pass inspection.
Hose reels and hydrants
Coverage checked against actual travel distance, with flow and residual pressure demonstrated by calculation.
Clean agent suppression
FM-200 or NOVEC for server rooms and electrical rooms, with concentration calculation, discharge time and room integrity requirements.
Fire detection and alarm
Detector selection and spacing for the ceiling type and height, sounder coverage checked for audibility, and the cause and effect matrix the commissioning engineer will test against.
Emergency lighting and exit signage
Escape route illuminance and signage placement verified against travel distances, not assumed.
Smoke control and pressurisation
Staircase and lobby pressurisation and car park smoke extract, coordinated with the mechanical package.
How a Civil Defence approval runs
- Occupancy and hazard classification. The classification decides the design density, the detection type and the escape requirements. Getting it wrong at this stage invalidates everything downstream of it.
- Design and hydraulic calculation. Layouts, riser diagrams, cause and effect matrix, and the calculations that support them.
- Civil Defence submission. Submitted under our approval, with comments handled directly by our engineers.
- Inspection and Certificate of Compliance. Witnessing the installation and the tests through to issue of the certificate.
Standards we design to
- UAE Fire and Life Safety Code of Practice
- NFPA 13 installation of sprinkler systems
- NFPA 20 stationary pumps for fire protection
- NFPA 72 national fire alarm and signalling code
- NFPA 2001 clean agent fire extinguishing systems
- NFPA 96 ventilation control for commercial cooking operations
Where we do this work
Khabir is based in Ras Al Khaimah and delivers electromechanical engineering consultancy across the United Arab Emirates — Dubai, Ras Al Khaimah, Abu Dhabi, Sharjah, Ajman, Umm Al Quwain, Fujairah — including industrial parks and free zones such as RAKEZ, Al Hamra Free Zone, Dubai Maritime City, and JAFZA. Our Etihad Water & Electricity Category-1 consultant licence (No. 0403) provides unlimited kilowatt connected load approval across the Northern Emirates, while our Civil Defence, Etisalat, and MEP site supervision capabilities cover projects nationwide.
Common questions
How long does Civil Defence approval take?
The design set is normally ready within one to two weeks of receiving complete architectural drawings. Review duration depends on the emirate and the building type, and we follow up until the approval is issued.
Our drawing was rejected. Can you fix it?
Yes. We review the comments against the code, identify what actually caused the rejection, correct the design and re-submit. Rejections most often trace back to hazard classification, a hydraulic shortfall, or detection coverage.
Do we need sprinklers in a small shop fit-out?
It depends on the occupancy, the area, the travel distance and whether the base building is already sprinklered. The classification decides it, and we confirm the requirement before any design work starts.
What is needed for a server room?
Typically a clean agent system such as FM-200 or NOVEC with a concentration calculation, room integrity confirmation, and detection interlocked to the discharge and to the building alarm.
Send us the drawings
Email or WhatsApp your architectural drawings or load requirements. We review them and come back with a clear scope, timeline and fee proposal within two working days.