HVAC and mechanical cooling design
Cooling is the largest single running cost in almost every building in the UAE, and it is also the item most often sized by rule of thumb. A tonnage picked from floor area alone is either short in August or oversized all year, and an oversized chiller short cycles, dehumidifies badly and costs more to run than the correct one would have.
We calculate rather than estimate. Loads are built hour by hour against real Gulf design conditions, real glazing, real orientation and the real occupancy of each space, so that the plant which gets installed is the plant the building actually needs.
What the mechanical scope covers
Hourly cooling load calculation
Zone by zone and hour by hour, against UAE design conditions rather than a generic climate file. Solar gain is calculated per facade and per orientation.
Chilled water plant design
Chiller selection and staging, primary and secondary pumping, pipe sizing, expansion and pressurisation, plant room layout and maintenance access.
VRF and split system design
Refrigerant pipe routing, branch selectors, condensate drainage falls, and outdoor unit placement that will not short cycle against a parapet wall.
Ducting and air distribution
Duct sizing by static regain or equal friction, diffuser selection and throw, and balancing dampers positioned where they can actually be reached.
Ventilation and pressurisation
Fresh air rates to ASHRAE 62.1, toilet and kitchen extract, car park ventilation including jet fan schemes, and staircase pressurisation for life safety.
Kitchen extract and ecology units
Grease laden vapour extract, ecology unit selection for odour and grease, and a discharge arrangement the municipality will accept.
Green building compliance
Design to the applicable emirate scheme, including Barjeel in Ras Al Khaimah, so that the mechanical package passes review the first time.
How the mechanical design is developed
- Load model. Architectural drawings, glazing specification, orientation and occupancy are turned into a zoned thermal model.
- System selection. Chilled water, VRF or split systems compared on capital cost, running cost, plant space and maintenance burden, with the trade-off written down rather than assumed.
- Detailed design. Equipment schedules, duct and pipe layouts, plant room arrangement and control philosophy.
- Approval and supervision. Submission where the authority requires it, then inspection of the installed work against the approved drawings.
Standards we design to
- ASHRAE 90.1 energy standard for buildings
- ASHRAE 62.1 ventilation for acceptable indoor air quality
- ASHRAE Handbook Fundamentals load calculation method
- SMACNA duct construction standards
- NFPA 96 for commercial kitchen extract systems
- UAE Fire and Life Safety Code for smoke control and pressurisation
Where we do this work
Khabir is based in Ras Al Khaimah and delivers electromechanical engineering consultancy across the United Arab Emirates — Dubai, Ras Al Khaimah, Abu Dhabi, Sharjah, Ajman, Umm Al Quwain, Fujairah — including industrial parks and free zones such as RAKEZ, Al Hamra Free Zone, Dubai Maritime City, and JAFZA. Our Etihad Water & Electricity Category-1 consultant licence (No. 0403) provides unlimited kilowatt connected load approval across the Northern Emirates, while our Civil Defence, Etisalat, and MEP site supervision capabilities cover projects nationwide.
Common questions
Why is my building not cooling even though the AC is new?
The usual causes are an undersized plant against real solar gain, duct sizing that cannot deliver the design airflow, or air distribution that leaves part of the space unserved. An hourly load calculation and an airflow check will identify which of the three it is.
Is a chiller or VRF better for my project?
It depends on size, diversity of use and who will maintain it. Chilled water usually wins above a certain capacity and where load runs continuously, and VRF wins on partial load and phased occupancy. We compare both on capital and running cost before recommending one.
Do you calculate loads or use a rule of thumb?
We calculate. Hourly loads are built against Gulf design conditions using the ASHRAE method, per zone and per orientation.
Can better design reduce the cooling cost?
Frequently. Correcting an oversized plant, improving zoning and revising the control philosophy reduce both the capital cost and the running cost, and the saving recurs every year the building operates.
Send us the drawings
Email or WhatsApp your architectural drawings or load requirements. We review them and come back with a clear scope, timeline and fee proposal within two working days.
Email info@khabirconsultant.ae WhatsApp +971 52 589 2287